REFERENCES

Türkmenbaşı Refinery Lubricating Oils Unit

Project Name: Türkmenbaşı Refinery Lubricating Oils Unit

City: Türkmenbaşı- Turkmenistan

Project Start Year: 04.15.2000

Completion Year: 01.10.2001

Employer:   Gama Industrial Plants Fabrication and Installation Inc.

Contractor: Pyramid Engineering Consulting Inc.

Technical Specifications of the project:  The main building, the administrative building, porch, transformers, laboratories, workshops and control building with truck loading station, railway loading station, tank foundations, pipe and cable bearing structures of architectural, construction, granting of preparation and consulting services for infrastructure projects.

Sivas-Erzincan Development Project

Project Name: Sivas-Erzincan Development Project

City: Sivas-Erzincan

Project Start Year: 10.01.2010

Completion Year: 05.18.2011

Employer:   Representatives of the United Nations Development Programme (UNDP)

Contractor: Pyramid Engineering Consulting Inc.

Technical Specifications of the project:  Sivas and Erzincan cities celected districts and villages irrigation systems supply design work. Water intake structure, piped irrigation and drainage network on the structures of building belongs solid and application design works.

 

Kırklareli Organized Industrial Zone Infrastructure Project

Project Name: Kırklareli Organized Industrial Zone Infrastructure Project

City: Kırklareli

Project Start Year: 04.16.2006

Completion Year: 06.08.2008

Employer:   Kırklareli Organized Industrial Zone

Contractor: Pyramid Engineering Consulting Inc.

Technical Specifications of the project:  Zoning plan and parcellation plan construction, ground land readjustment applications, infrastructure ground exploration report, infrastructure preliminary projects, infrastructure implementation projects, exploration and tender documents preparation, Telecom projects, natural gas projects and infrastructure gallery system works.

 

Kemalpaşa Organized Industrial Zone Infrastructure Project

Project Name: Kemalpaşa Organized Industrial Zone Infrastructure Project

City: İzmir

Project Start Year: 03.20.2008

Completion Year: 09.12.2008

Employer:   Kemalpaşa Organized Industrial Zone

Contractor: Pyramid Engineering Consulting Inc.

Technical Specifications of the project:  Topographic mapping, infrastructureground exploration report, application infrastructure projects (roads, sewage, storm water, drinking water) LV-MV distribution and SCADA networks, diversion channels, exploration and preparation of tender documents.

 

Bozüyük Organized Industrial Zone Infrastructure Project

Project Name: Bozüyük Organized Industrial Zone Infrastructure Project

City: Bilecik

Project Start Year: 08.31.2006

Completion Year: 07.11.2007

Employer:   Bozüyük Anatolian Organized Industrial Zone

Contractor: Pyramid Engineering Consulting Inc.

Technical Specifications of the project:  Topographic mapping, application infrastructure projects (roads, waste water, storm water drainage, drinking water) LV-MV distribution power transmission line projects, gas-feasibility study application projects

 

Ankara Anatolian Organized Industrial Zone Infrastructure Project

Project Name: Ankara Anatolian Organized Industrial Zone Infrastructure Project

City: Ankara

Project Start Year: 03.20.2008

Completion Year: 12.09.2008

Employer:   Ankara Anatolian Organized Industrial Zone

Contractor: Pyramid Engineering Consulting Inc.

Technical Specifications of the project: Topographic mapping, infrastructure, ground investigation report, application infrastructure projects (roads, sewage, storm water, drinking water) LV-MV distribution power transmission line project, natural gas, telecommunications, exploration and tender documents, ponds application project preparation.

 

Troas Solid Waste Association (Ayvacık Bayramiç-Ezine-Geyikli-Gülpınar-Mahmudiya-Bozcaada-Küçükkuyu) (Canakkale) Solid Waste Elimination Plant Final Project

Project Name: Troas Solid Waste Association (Ayvacık Bayramiç-Ezine-Geyikli-Gülpınar-Mahmudiya-Bozcaada-Küçükkuyu) (Canakkale) Solid Waste Elimination Plant Final Project

City: Çanakkale

Project Start Year: 09.04.2014

Completion Year: 04.30.2015

Employer:   İller Bank İnc

Contractor: Pyramid Engineering Consulting Inc.

Technical Specifications of the project:  A regular storage facility contain (storage lots 3 lots, plant transportation and installation of domestic routes, guard booth of-weigher, wheel washing unit, administrative buildings - workshop, water storage, packaging waste separation, medical waste sterilization and storage of hazardous waste battery sterilization and storage plant, leachate pool) generator transformers, power supply, it includes also biometanisation.

 

Beypazari (Ankara) Solid Waste Elimination Plant Final Project

Project Name: Beypazari (Ankara) Solid Waste Elimination Plant Final Project

City: Ankara

Project Start Year: 04.17.2008

Completion Year: 05.18.2009

Employer:   Ministry of Environment and Forestry, Special Environmental Protection Agency

Contractor: Pyramid Engineering Consulting Inc.

Technical Specifications of the project: N2026: 55 147 people and a total storage volume of 517 035 cubic meters consisting 2 lots of landfill, scales, wheel washing unit, workshop building, administrative building, leachate collection pool, water tank, waste batteries projecting permanent and temporary storage unit.

 

Foça Solid Waste Regular Storage Plant Closure Project

Project Name: Foça Solid Waste Regular Storage Plant Closure Project

City: İzmir

Project Start Year: 09.04.2009

Completion Year: 11.24.2009

Employer:   Ministry of Environment and Forestry, Special Environmental Protection Agency

Contractor: Pyramid Engineering Consulting Inc.

Technical Specifications of the project: General layout (mapped and map) (1/1000, 1/500 scale), bevelling and after filling  showing the state waste disposal plan, section and cubic belonging to waste regulation plan, design type section and details regarding the application (various scales),  Gas drainage and piping plan and disposal methods, landscaping plans and details, observation wells, plan sections and details, the layout of the units in the plant (elevation and coordinated), application project the preparation of the the report and tender documents.

 

Antalya-Okurcalar Deep Sea Discharge Application Project

Project Name: Antalya-Okurcalar Deep Sea Discharge Application Project

City: Antalya

Project Start Year: 08.09.2005

Completion Year: 04.10.2006

Employer:   Development Bank of Turkey Inc.

Contractor: Pyramid Engineering Consulting Inc.

Technical Specifications of the project: Land line 1140 m, 723 m sea line (Ø800 mm HDPE Pipe) and Ø600 mm, 70 m. Total 1933 m, including diffuser line. Line of long sea outfall  (Batimetric, geotechnical and oceanographic measurements, numerical modeling studies, project reports, quantities and estimates etc.) application projects works.

 

Of(Trabzon) Deep Sea Discharge Final Project

Project Name: Of(Trabzon) Deep Sea Discharge Final Project

City: Trabzon

Project Start Year: 05.27.2004

Completion Year: 11.29.2004

Employer:   İller Bankası İnc

Contractor: Pyramid Engineering Consulting Inc.

Technical Specifications of the project: N2040:98.177 people and Qmax 328,03 l / s on land 14.65 m. line and at sea 906 m buried deep sea discharge line designed. Diffuser height 44m water depth at the discharge point is the -30,5 m.

 

 

Sürmene (Trabzon) Deep Sea Discharge Final Project

Project Name: Sürmene (Trabzon) Deep Sea Discharge Final Project

City: Trabzon

Project Start Year: 05.05.2005

Completion Year: 07.05.2006

Employer:   İller Bankası İnc

Contractor: Pyramid Engineering Consulting Inc.

Technical Specifications of the project:N2040:50.000 people and Qmax 122l / s on land 80m. line and at sea 900 m buried deep sea discharge line designed. Diffuser height 30m water depth at the discharge point is the -30,7 m.

 

Bulancak (Giresun) Deep Sea Discharge Final Project

Project Name: Bulancak (Giresun) Deep Sea Discharge Final Project

City: Giresun

Project Start Year: 07.16.2007

Completion Year: 07.16.2008

Employer:   İller Bankası İnc

Contractor: Pyramid Engineering Consulting Inc.

Technical Specifications of the project: N2042:95.000 people and Qmax 326 l / s on land 88m. line and at sea 1200 m buried deep sea discharge line designed. Diffuser height 90m water depth at the discharge point is the -32,5 m.

 

Beşükdüzü (Trabzon) Deep Sea Discharge Final Project

Project Name: Beşükdüzü (Trabzon) Deep Sea Discharge Final Project

City: Trabzon

Project Start Year: 11.12.2010

Completion Year: 02.23.2012

Employer:   İller Bankası İnc

Contractor: Pyramid Engineering Consulting Inc.

Technical Specifications of the project: N2045: 50 514 people and Qmax 160 l / s on land 254.62 m. line and at sea 1100 m buried deep sea discharge line designed. Diffuser height 54 m water depth at the discharge point is the -23.05 m.

 

Rize (Central) 3. Deep Sea Discharge Final Project

Project Name: Rize (Central) 3. Deep Sea Discharge Final Project

City: Rize

Project Start Year: 04.24.2014

Completion Year: 02.11.2015

Employer:   İller Bankası İnc

Contractor: Pyramid Engineering Consulting Inc.

Technical Specifications of the project: 2029 population of 56 900 people and Qpr: 10832.91 m³ / day, 2049 population of 73,000 people and Qpr: 15484.80 m³ / day capacity wastewater pre-treatment plant, with 736 m deep sea discharge line H = 33.33 m depth, L = 60 m long diffuser projecting heard.

 

Rize (Central) Deep Sea Discharge Final Project

Project Name: Rize (Central) Deep Sea Discharge Final Project

City: Rize

Project Start Year: 09.13.2011

Completion Year: 02.11.2013

Employer:   İller Bankası İnc

Contractor: Pyramid Engineering Consulting Inc.

Technical Specifications of the project:  N2046: 137.500 people and Qmax: 38010 m³ / day, on land and 80 m, in the sea 800 m buried deep sea discharge line has been designed. Diffuser height is 30 m and water depth at the discharge point is 32 m.

 

Kumbağ (Tekirdag) Sewerage connection Final Project

Project Name: Kumbağ (Tekirdag) Sewerage connection Final Project

City: Tekirdağ

Project Start Year: 01.21.2011

Completion Year: 10.19.2011

Employer:   İller Bankası İnc

Contractor: Pyramid Engineering Consulting Inc.

Technical Specifications of the project:  N2046: 81,000 people and the total projected flow of 118 l / s 29 134 m, Stage 1. 58 094 m. Stage 2. final project of distribution lines works, 75 m ground drilling and 45m exploration pit works.

 

Beypazari (Ankara) Sewerage Connection Final Project

Project Name: Beypazari (Ankara) Sewerage Connection Final Project

City: Ankara

Project Start Year: 10.28.2011

Completion Year: 11.29.2011

Employer:   İller Bankası İnc

Contractor: Pyramid Engineering Consulting Inc.

Technical Specifications of the project:  N2046: 80,000 people and the total projected flow of 230 l / s and 148 257 m,  Stage 1  146 993 and, Stage 2. final connection projects. Satge 1 stormwater lines construction works, 211 m ground drilling and 53,5m exploration pit works.

 

Karatas (Adana) Sewerage connection Application Project

Project Name: Karatas (Adana) Sewerage connection Application Project

City: Adana

Project Start Year: 10.18.1998

Completion Year: 11.22.2000

Employer:   İller Bankası İnc

Contractor: Pyramid Engineering Consulting Inc.

Technical Specifications of the project:  Project population of 150.00 and total project flow of 695 l / s, 339 km sewerage supply, 1 pumping station hydraulic calculations, architectural projects and concrete projects, 5 pumping by central hydraulic calculations and architectural projects, water treatment plant preliminary design has been prepared.

 

Arpaçbahşiş (ICEL) - Kargıpınarı (ICEL) - Tömük (ICEL) - Sewerage connection Application Project

Project Name: Arpaçbahşiş (ICEL) - Kargıpınarı (ICEL) - Tömük (ICEL) - Sewerage connection Application Project

City: Mersin

Project Start Year: 10.13.2000

Completion Year: 09.26.2001

Employer:   İller Bankası İnc

Contractor: Pyramid Engineering Consulting Inc.

Technical Specifications of the project: 

Arpaçbahşiş: Project population of 50,000 people and the total project flow 232 l / s and a total of 66 km within the scope of business. making the supply pipeline project

Kargıpınarı: Project population of 50,000 people and the total project flow 232 l / s and a total of 105 km within the scope of business. making the supply pipeline project

Tömük: Project total population of 115,000 people and project flow 532 l / s with a total business scope of 97 km. 1 distribution line and pumping station project 

 

Bodrum Peninsula Drinking Water Transmission Line Project Revision

Project Name: Bodrum Peninsula Drinking Water Transmission Line Project Revision

City: Muğla

Project Start Year: 01.08.2009

Completion Year: 04.19.2009

Employer:   State water Department DSI

Contractor: Pyramid Engineering Consulting Inc.

Technical Specifications of the project:  Groundwater shooting to be obtained from the area 5,17 hm³ / year is planned to be taken with a branch from the water by existing barrage's transmission line 5.00 hm³ / year 500 m³ collection in order to be transmitted by water, one transmission line and 500 m³ loading tank, charming 17.701 m in length transmission line construction. 5 pumping stations, 1,546 m long promoted line, where the application on which to art structure project and necessary state the service and connection preparation of the road belonging to the project preparation, the identification of investment needs over the years, the calculation of unit cost of water, preparation of expropriation plan, preparation of operation and maintenance of books and GIS works work.

 

Ankara Metropolitan Municipality Directorate of Contiguous Northern District neighborhood and village in the area Transmission Line, Pressure Line, Reservoir, Pumping Station, Drinking Water Plant Construction Project

Project Name: Ankara Metropolitan Municipality Directorate of Contiguous Northern District neighborhood and village in the area Transmission Line, Pressure Line, Reservoir, Pumping Station, Drinking Water Plant Construction Project

City: Ankara

Project Start Year: 08.24.2010

Completion Year: 02.07.2012

Employer:   Ankara Metropolitan Municipality Directorate of Ankara Water and Sewerage Administration General Directorate (ASKI)

Contractor: Pyramid Engineering Consulting Inc.

Technical Specifications of the project:  A total of 20 districts and villages mains, water pipeline, tanks, pumping stations, drinking water facilities construction projects.

 

Anamur (Mersin) Drinking Water Final Project

Project Name: Anamur (Mersin) Drinking Water Final Project

City: Mersin

Project Start Year: 04.19.2007

Completion Year: 06.09.2008

Employer:   İller Bankası İnc

Contractor: Pyramid Engineering Consulting Inc.

Technical Specifications of the project:  N2042: 230,000 people and total project flow 600 l / s within the scope of this project,  need L = 48 202 m Transmission lines, need two 400 m³ tank and 1000 m³ and 700 m³  built-in tanks storage needs for Cevizligöz 1-2 water supply satisfaying project preparation works.

 

Elbistan Water Supply System Rehabilitation and Preparation and Construction Supervision for Wastewater Treatment Project Bidding Documents Consultancy Services

Project Name: Elbistan Water Supply System Rehabilitation and Preparation and Construction Supervision for Wastewater Treatment Project Bidding Documents Consultancy Services

City: Kahramanmaraş

Project Start Year: 09.18.2007

Completion Year: 05.04.2010

Employer:   Elbistan Municipality

Contractor: Pyramid Engineering Consulting Inc.

Technical Specifications of the project:  Examining material quantities and project, if deemed necessary to revise the project to ensure maximum efficiency and energy saving according to European Union standards and the preparation of final design, preparation of tender documents, the issuance of construction and supervision services.

 

Tekirdağ Saray Ayvacık Pond Project Construction

Project Name: Tekirdağ Saray Ayvacık Pond Project Construction

City: Tekirdağ

Project Start Year: 02.24.2012

Completion Year: 12.11.2014

Employer:   DSI 11 Regional Directorate

Contractor: Pyramid Engineering Consulting Inc.

Technical Specifications of the project: Ayvacık Pond application (hydraulic, mechanical, electrical, architectural, structural reinforced concrete) construction of the project, drinking - using water and making population projections for the provision, the determination of water requirements, determination of the required drinking water facilities, determination floor and implementation of the facility projects (hydraulic, mechanical, electrical, architectural, structural reinforced concrete, SCADA-automation, cathodic protection) done mainly footage the construction tender exploration, preparation and technical specifications of the green file works.

 

Şırnak Cizre Drinking Water Project Construction

Project Name: Şırnak Cizre Drinking Water Project Construction

City: Şırnak

Project Start Year: 03.07.2012

Completion Year: 07.21.2014

Employer:   DSI 10 Regional Directorate

Contractor: Pyramid Engineering Consulting Inc.

Technical Specifications of the project:  To provide ergani and handle the needs of the districts drinking and process water, making population projections, the determination of water requirements, determination of the required drinking water facilities, the floor of the facility and application projects (hydraulic, mechanical, electrical, architectural, structural reinforced concrete SCADA-automation, cathodic protection) works, mainly footage of the construction tender exploration, preparation of the technical specifications and the green file work.

 

Diyarbakir Ergani Drinking Water Project Construction

Project Name: Diyarbakir Ergani Drinking Water Project Construction

City: Diyarbakir

Project Start Year: 12.03.2010

Completion Year: 07.03.2013

Employer:   DSI 10 Regional Directorate

Contractor: Pyramid Engineering Consulting Inc.

Technical Specifications of the project:  To provide ergani and handle the needs of the districts drinking and process water, making population projections, the determination of water requirements, determination of the required drinking water facilities, the floor of the facility and application projects (hydraulic, mechanical, electrical, architectural, structural reinforced concrete SCADA-automation, cathodic protection) works, mainly footage of the construction tender exploration, preparation of the technical specifications and the green file work.

 

Edirne Uzunköprü Wastewater Treatment Plant Final Project

Project Name: Edirne Uzunköprü Wastewater Treatment Plant Final Project

City: Edirne

Project Start Year: 01.23.2012

Completion Year: 07.23.2012

Employer:   DSI Wastewater Department

Contractor: Pyramid Engineering Consulting Inc.

Technical Specifications of the project:  13537 m³ / day capacity, coarse and fine screens, aeration grit and grease, anaerobic, aeration, clarifiers and sludge stabilization ponds, recirculation, excess sludge, filtrate water and inlet pumping station, pumping station, collector line, blower building, rapid sand filtration, UV disinfection units, construction of the administration building architecture, electricity, exploration and preparation work for the construction of the mechanical application metering project.

 

Kırklareli Central Wastewater Treatment Plant Construction

Project Name: Kırklareli Central Wastewater Treatment Plant Construction

City: Kırklareli

Project Start Year: 01.23.2012

Completion Year: 09.29.2012

Employer:   DSI Wastewater Department

Contractor: Pyramid Engineering Consulting Inc.

Technical Specifications of the project:  21040 m³ / day capacity, coarse and fine screens, aeration grit and grease, anaerobic, aeration, clarifiers and sludge stabilization ponds, recirculation, excess sludge, filtrate water and inlet pumping station, pumping station, collector line, blower building, rapid sand filtration, UV disinfection units, construction of the administration building architecture, electricity, exploration and preparation work for the construction of the mechanical application metering project.

 

Kepez (Çanakkale) Wastewater Treatment Plant Final Project

Project Name: Kepez (Çanakkale) Wastewater Treatment Plant Final Project

City: Çanakkale

Project Start Year: 05.24.2004

Completion Year: 12.29.2004

Employer:   İller Bankası İnc

Contractor: Pyramid Engineering Consulting Inc.

Technical Specifications of the project:  N2039: 50,000 people and Qmax: 137.4 l / s wastewater treatment plant projects with the extended aeration activated sludge process has been prepared.

 

Biga (Çanakkale) Wastewater Treatment Plant Final Project

Project Name: Biga (Çanakkale) Wastewater Treatment Plant Final Project

City: Çanakkale

Project Start Year: 04.24.2009

Completion Year: 12.27.2010

Employer:   İller Bankası İnc

Contractor: Pyramid Engineering Consulting Inc.

Technical Specifications of the project: N2044: 80,000 and Qmax 238 l / sc  Fİnal project of domestic wastewater with nitrogen - phosphorus outlet biological wastewater treatment plant.

 

Çobanlar – Kocaöz – Işıklar – Sülümenli Wastewater Treatment Plant Final Project

Project Name: Çobanlar – Kocaöz – Işıklar – Sülümenli Wastewater Treatment Plant Final Project

City: Afyonkarahisar

Project Start Year: 12.26.2011

Completion Year: 05.02.2013

Employer:   İller Bankası İnc

Contractor: Pyramid Engineering Consulting Inc.

Technical Specifications of the project:  N2046: 60,000 and Qmax: 0,085 m³ / sec definitive project of the wastewater treatment plant for domestic wastewater by providing a discharging system nitrogen - phosphorus outlet, extended aeration activated sludge process who ensure the discharge purified water.

 

Tatvan (Bitlis) Wastewater Treatment Plant Final Project

Project Name: Tatvan (Bitlis) Wastewater Treatment Plant Final Project

City: Bitlis

Project Start Year: 09.29.2006

Completion Year: 12.07.2007

Employer:   İller Bankası İnc

Contractor: Pyramid Engineering Consulting Inc.

Technical Specifications of the project: N2041: 186 018 people and Qmax 500 l / sec definitive project of the wastewater treatment plant for providing to discharge purified domestic wastewater.

 

Karamürsel, Körfez, Kullar, Yeniköy and 42 evler Wastewater Treatment Plant Project Preparation of the revision

Project Name: Karamürsel, Körfez, Kullar, Yeniköy and 42 evler Wastewater Treatment Plant Project Preparation of the revision

City: Kocaeli

Project Start Year: 10/17/2012

Completion Year: 09/15/2014

Employer:   Kocaeli Metropolitan Municipality ISU Directorate General

Contractor: Pyramid Engineering Consulting Inc.

 

Technical Specifications of the project:

 

Kullar + 42 Evler : N2014: 700,000 people and Qortin: 140,000 m³ / day, the scope of this work consist a complete wastewater treatment plant project and contains Biological Activated Sludge System, aerobic sludge digestion, Odor Removal + Odor treatment and advanced disinfection system with ground surveys and improvement, mapping, process, mechanical, electrical works.

 

Yeniköy : N2014: 300,000 people and Qortin: 60.000 m³ / day the part of this business is Biological Activated Sludge System and Advanced disinfection system with ground surveys and improvement, mapping, process, mechanical, electrical, complete wastewater treatment plant project static concrete made has been prepared.

 

Körfez : N2014: 225,000 people and Qortin: 61 200 m³ / day is the part of this business Biological Activated Sludge System and Advanced disinfection system with ground surveys and improvement, mapping, process, mechanical, electrical, complete wastewater treatment plant project static concrete made has been prepared.

 

Karamürsel : N2014: 60,000 People and Qortin: 18,000 cubic meters / day and Biological Activated Sludge System Transformation and capacity ground surveys and improvements to increase the classic active sludge systems covered by this work, mapping, process, mechanical, electrical, structural concrete made complete wastewater treatment plant project has prepared.